top of page
background2.jpg
OUR EXPERTISE

OUR EXPERTISE

Air Cooled Condenser GEA Uran.png
Erection & commissioning
  • Erection of Static and Rotating Equipments

  • Storage Tanks

    • Site Fabrication, Erection and Testing

  • Structures and allied civil works

    • Site Fabrication and Erection

Hydraulic Piping for CRM Egypt.png
Fabrication and erection of piping
  • Industrial Piping 

    • Commissioning, Site Fabrication, Erection, Welding, Stress Relieving, Testing

    • Low pressure and high pressure piping of mild steel, high carbon steel, stainless steel and Alloy steels etc.

125 MW Generator Ansaldo.png
Electrical installations
  • Electrical installation including installation of Transformers, Panels, Motors and Laying of Cables, Cable termination and testing

  • Overhauling of electrical and mechanical machinery

  • Non Destructive Testing such as Radiography, Ultrasonic, Magnetic particles and Hardness testing

  • Associated civil works

QUALITY AND SAFETY

QUALITY POLICY

We shall strive to provide services to meet and exceed customer expectations of quality, time schedule and cost with safe working environment through continued review and improvement of services provided by us.

SAFETY POLICY

MESUKA  recognizes its obligations under the safety, health and environment to provide safe and healthy place of work for its employees. The company will make every effort  in the areas of accident  prevention, hazard control and removal injury protection, health preservation and promotion to achieve a safe work place and will encourage its clients to do the same.

       

 We believe safety, health and environment at work is a shared responsibility for all employees and the success of any safety health and environment program ultimately rests on the willingness of everyone to work co-operatively and with a team spirit. Managers and supervisors will prepare, communicate and implement safety plans, including safety training as & when required. They will consider safety as the prime factor when designing and implementing all work systems.

All employees are also responsible for their own safety and that of their fellow Employees. They must take immediate action to minimize the danger from any unsafe condition and ensure that the Supervisor or Manager is informed accordingly of any such conditions.

 

                                                                    BOARD OF DIRECTORS

ABOUT
3.jpg

ABOUT

Mesuka Engineering Co. Pvt. Ltd. was incorporated by Late Shri S.V. Subramanian and Mr. N.K. Kapoor in the year 1986.

The Company is engaged in Engineering Construction in Civil, Mechanical & Electrical Works. The companys strength lies in Mechanical Engineering Construction works of all types. The experience list consists of successful completion of Fabrication and Erection of Structures and Tank Farms, Rolling and Welding of large diameter pipes, Installation and Commissioning of Piping and Equipments. Mesuka has served Power, Steel, Cement and Petrochemical Industries.

Mesuka is proud to have been associated with some of the MNCs like NKK (Japan), GEA Energietechnik (W.Germany), Bechtel (USA), G+H Montage (Germany), Hyundai Heavy Industries Ltd. (South Korea), Ansaldo (Italy), Tata Steel, Tata Power, Raymond's, Jindal's, Kalyani's, Welspun, Hindustan Lever, SAIL, Ruchi Group, Mahindra's, NTPC, Ispat Industries, Vikram Ispat, Lloyd Steel, Remi Metals etc. for their prestigious Projects in India and have played major role in their ventures in India. Mesuka has also worked for large Industrial houses like Tatas, Raymond, Lloyd Steel, Remi and Hindustan Lever etc. The contracts handled for these companies involved stiff time schedules with international quality standards. Mesuka has always achieved the schedule targets maintaining stringent quality standards. All this has been possible because of meticulous planning of the work and resources and the personal interest taken by the top management.

The Company has a team of well qualified and experienced engineers & supervisors for project management and project execution. The team is built over the years by inducting experienced personnel of different disciplines from well known Industrial houses and training the Junior Engineers on the job. With strategic resource planning Mesuka has acquired state of the art construction machinery and equipments for mechanizing all the construction works being handled by it.

THE TEAM

Mr. N.K. Kapoor

Director

Over 30 years experience in the construction field of which 7 years with TATA ELECTRIC COS as Engineer-in-Charge of the entire LP Piping for the 500 MW Thermal Power Project.  Last 34 years working as Director of Mesuka Engineering Co Pvt Ltd and looking after the Planning & Commercial aspects of the Contracts.  Specializes in Fabrication, Piping and Welding works.

Mr. G Monikandan

General Manager

Over 35 years of experience of project management and execution in Power and Steel plants.

Mr. K.N. Satyan  

Sr. Vice President (Operation)

Over 40 years experience of Project Execution in Power and Steel Plant with specialization in all types of piping works including Petrochemical, Chemical and Steam Piping.

Mr. Praveen Singh

General Manager

Over 35 years of experience of project management and execution in Power and Steel plants

PROJECTS

1986

Year Established

ISO

9001:2015
Certified

NSIC - CRISIL

SE-2A
High performance capability and high financial strength
Crisil+SE1a.JPG

PROJECTS

Mesuka has been engaged in large and medium-size multidisciplinary projects in Mechanical, Electrical, Civil and Structural works.

Area of specialization includes Project Engineering, Project Management and Project Execution. The Company has closely associated with power, steel, cement and petrochemical industries and served them with distinction

Salem Steel Plant - Salem, Tamil Nadu

M/S Steel Authority of India

Handling, erection, testing & commissioning of Skin Pass Mill Erquipments and related Utility and Service Piping, Slab Caster Equipments and piping and Electrical for Salem Steel Plant.

Erection work including supply of items, rendering assistance in start-up, testing & commissioning & during performance guarantee tests for Plant & equipment of Electric ARC Furnace, Ladle Furnace, Refining Converter in Steel Melting Shop and Coil Preparation line & Slitting Line with packing unit and Cold Rolling Mill including all electrical and automation work.

Welspun Gujarat Stahl Rohren Ltd. - Anjar

Erection of Mechanical equipments for 4.5 M wide Steckel Mill along with fabrication and erection of Finishing Mill, Aux. Hydraulic. SS, CS and High Pressure De-scaling piping at Anjar

M/s. JSL Limited - Kalinga Nagar, Jajpur Orissa

CRM Equipment including Hot Annealing line , Cold Annealing line and Cold Rolling Mills Erection, Testing and commissioning (Unloading/Loading ,unpacking and shifting of equipments from storage yard/fabrication site to erection site, erection on foundation,leveling, alignment, testing, commissioning of equipments) at Kalinga Nagar Industrial Complex, Orissa

Abul Khair Steel Production Ltd.

Dismantling, Overhauling, Re-erection & Commissioning assistance of 20 HI Sendzimir Mill.

Location: Chittagong, Bangladesh.

Equipment Erection for 3 Nos. 20 Hi Sendzimir Cold Rolling Mills, 3 Nos. CGL lines & 6 Nos. CTL line and 1 No. Tension Leveller line for M/s. Abul Khair Steel Products Ltd., at Bangladesh.

Location:Chittagong, Bangladesh

Appollo Ispat Complex Ltd.

Erection of 6Hi Cold Rolling Mills Complex including Mechanical, Piping & Electrical works. Weight of all the equipments handled was 2500 MT. 

Location:Dhaka, Bangladesh​

 

Bharat Forge Ltd.

Erection and commissioning of Counter Blow Hammer Forging Line equipments and piping for Bharat Forge Ltd. at Baramati.

Location:Baramati, India.

Erection and commissioning of 4000T Hydraulic Press and 160 T/125 T Ring Rolling Machine equipments and piping.

Location:Baramati, India.

China First Mettalurgical Const. Corp.

Erection and commissioning of 3 Nos. ESP and Fuel bag house for 198 m2 Sinter Plant.

Location:Dolvi

Kalyani Thermal Systems Ltd.

Erection and alignment of Water Quenching & Oil Quenching Tanks, Tempering & Slow Cooling Furnaces with all related oil, water & air piping for HFD-II at BFL.

Location:Mundhwa, Pune.

Kalyani Steels

Erection & Commissioning of Equipments for Seamless Tube Manufacturing Plant.

Location:Baramati, India.

Installation of Turnover Type cooling Bed, shot blasting machine and Hot Saw Machine equipments. 

Location: Pune, India.

KTMS Engineering Pvt. Ltd.

Erection of 6000T & 2500 T Press at Bharat Forge Ltd. Erection and commissiong of Eumuco 5000T Press at Bharat Forge Ltd. Overhauling of Blooming mill equipments and erection commissioning of the same for Kalyani Carpenter Special Steel Ltd.

Location:Pune, India.

Erection and commissioning of CKW - 4000T Press and all related piping works for HFD-II at BFL, Pune.

Locaiton:Mundhwa, Pune.

KYCR Coil Industries Ltd.

Job Description:

Complete Mechanical & Electrical Installation works of 6 Hi Cold Rolling SMS Mill complex for M/s. KYCR Coil Industries Ltd. at Jormtal, Chittagong.

Location:Chittagong, Bangladesh.

Mahindra Ugine Steel Co. Ltd. (MUSCO)

Unloading, handling, unpacking, refurbishing, erection , testing & commissioning of 8-Stand Continuous Mill and all the utility and service piping for the Mill at MUSCO.

Location:Khopoli, Maharashtra.

Dismantling & loading of Mechanical equipments and interconnected piping at TISCO Ring Plant, Adityapur & Jamshedpur. Transportation, unloading, shifting, erection and commissioning of the same at MUSCO.

Location:Khopoli, Maharashtra.

National Steel

Revamping, Erection & Commissioning of 4 Hi Cold Rolling

Mill.

Location: Indore

Erection & Alighment of 2 x 5 MW Diesel Generating Sets including all Auxiliaries, Piping, Cabling and Electricals

Location:Indore

Raymond Steel.

Erection, Alignment & Commissioning of 4 High Reversing Cold Rolling Mill, 4 High Skin Pass, 4 Hi Mill, Silicone Line, Slitter, ECL Line Heat & Flattening Line, Normalising line and Fabrication, Assembly and Erection of 200 M long Tunnel Furnace including all utility & Hydraulic Piping, Cabling and Electricals totalling to over 6000 MT.

Location:Wadivarhe, Nasik India

Remi Metals Gujrat. Ltd

Revamping, Erection & Commissioning of 2500 Ton capacity Hot Seamless Tube Extrusion Press, Blooming Mill and Auxiliaries, Utility, Hydraulic Piping (400 Bar Bar Press) Cabling & Termination. Design, Erection of Surface Treatment Plant including 300 TPD Rotary Hearth Furnace and also Induction Furnace Totalling to about 4300 MT.

Location: Bharuch

Six October for Light Sections Co.

Erection, Alignment & Piping works of 4 Hi Cold Rolling Hitachi Mill Equipments at Six October for Light Section Co., Egypt.

Location:Egypt

Tata Steel Ltd.

Design, Supply and Erection of Surface Treatment Plant comprising of process tanks and all auxiliary equipments for New Tube draw Mill.

Location:Jamshedpur, Jharkhand.

Technova Imaging Systems (P) Ltd.

Erection and alignment of Continuous Coating Line Equipments at Taloja. 

Locaiton:Taloja, Maharashtra.

Welspun, Gujrat

Overhauling and erection and commissioning of complete equipments for Steckel Mill & auxiliaries including piping at Anjar, Kutch. The job involved erection of equipments and all piping works (upto 40 mm thick for Water Hydraulic) totalling to 20,000 MT.

Location:Anjar, Kutch, India.

Ansaldo, Italy.

Installation of Electro Mechanical equipments for 2 x 125 MW lignite base Power Plant for M/s. Ansaldo. The job involves installation of Turbo Generator and Auxilliaries, Piping, Electrical and Instrumentation works for 2 x 125 MW Power Plant at Bhuj.

Location: GMDC, Bhuj, India

BWSC, Mauritius.

Mechanical & Electrical erection works for the extension of St. Louis Thermal Power Station. 3 x 14 MW D.G. Power Plant entire mechanical, electrical & piping work for Central Electricity Board, Mauritius.

Location: Port Louis, Mauritius

G+H Schallaschutz

Erection and commissioning services for 3 Nos. Air Intake Systems comprising of steel structures, air ducts, air filters, instrumentation and cabling etc. for 1100 MW Sugen Combined Cycle Power Plant at Surat

Location: Surat, Gujarat

G+H Montage

Assembly and Erection of Air Intake Filters, Ducting and Exhaust Gas System including Stack for 3 units of 120 MW each Gas Turbines. Job also involves complete thermal Insulation and Clading from out side for Air duct and Insulation/ SS cladding from inside for Exhaust Stack.

Location:Paguthan, Bharuc, India​

Assembly and Erection of Air Intake Duct and Exhaust Gas Duct for Gas Turbines for 430 MW Combined Cycle Power Plant. Job also involves Complete Thermal Insulation and Cladding of Air duct from outside and Insulation and SS Cladding of Exhaust duct from inside.

Location: Faridabad, India

GEA

Fabrication and Erection of Structures and Rolled & welded 

Pipes (upto 4.2 Mtr dia x 14 mm thick), Erection and Thermal insulation Commissioning of equipments and Piping for Steam, Condensate,

Water & Air System totalling to about 6000 MT for Air Cooled 

Condensor for 2 x 120 MW Turbine. 

Location: MSEB, Uran, Mumbai

Tata Power

Welding Repairs of 4.2 mtr. dia Conduits at Bhira Hydro Power Station The job involved Radiogrpahy of Weld Joints of 30 years old pipe, Repairs to the welding under the inspection of NUCLEAR POWER CORPORATION

Location: Bhira, Maharashtra, India

Installation of Gas Turbine Piping for Unit No 7, 1 x 120 MW

Location: Trombay, Bombay Maharashtra India

Design, Supply, Erection & Commissioning of Piping work & Tanks for 3 x 24 MW Hydro Power Project Plant. 

Location: Bhivpuri, Maharashtra, India

Replacement of 1086 mm dia x 1 km lenght Penstock pipe at Khopoli Hydro Power station for 150 MW Hydro Power Plant.

Location: Khopoli, Maharashtra, India.

Hyundai heavy industries

Design & fabrication of tank farm for 200 MW Diesel Power Plant 

including the fabrication, painting & insulation of tanks upto 

10,000 cu.m. capacity.

Location: Basin Bridge , Chennai, India

ACC Ltd

Installation of 2500 TPD Cement Plant Equipments totalling to 5500 MT, including 4 M dia x 60 M long Kiln. 

Location:Laxmi Cement, Abu Road, India.

Bechtel International Inc

Composite services for Civil, Mechanical & Electrical works of Phase I, 700 MW Combined Cycle Power Plant. 

Location:Dhabol, India.

Hindustan Lever Ltd

Design & fabrication of Tanks including process tanks on load cells upto 200 MT capacity.

Location:Khamgaon, Maharashtra India.

 

NKK corporation

Civil Structural and Piping works for Ethane Propane Recovery Project at ONGC , Location:Uran

Tata Construction and Projects Ltd.

Upgradation of Canron & Davy Mill & Commissioning assistance at INDAL.

Location:Taloja, India.

 

Tata Vashisti Detergents Ltd​

Civil, Structural, Mechanical and Electrical Works of Fatty Acid and Stearic Acid Plant.

Location:Chiplun, India.

Tata Oil Mills Co. Ltd

Design & fabrication of Tanks & Piping for at Aurangabad factory. 

Location:Aurangabad, Maharashtra, India.

CLIENTS

CLIENTS

CONTACT

CONTACT

ENQUIRIES

Success! Message received.

Join Us
Head Office

406 Vardhaman Market
Sector-17, Vashi
Navi Mumbai, INDIA
400705

Email: mesuka1@gmail.com

To apply for a job with Mesuka Engineering, please send a cover letter together with your C.V. to: mesuka1@gmail.com

bottom of page